The Nuclear Regulatory Commission (NRC) on July 19 approved a request by Entergy Operations Inc. to increase the power generating capacity of Unit 1 at the Grand Gulf Nuclear Station by 15 percent. The power uprate for the boiling water reactor will increase the plant’s power generating capacity from about 1,300 to 1,500 MWe.
Pages
- Climate, Earthquake, and Vulcanism Resources
- 2018 Update On Actual Global Warming Data -- HadCRUT Data from the UK Charted
- Videos, Fukshima Blew Up in a Prompt Criticality
- Why Shut Down Nuke?
- Radiation Removal
- Rad Prep Shelter in Place Checklist
- Uranium Aerosolized Into Atmosphere
- Gundersen Email / Theories
- Largest Lies of Nuke
- Alternative Resources to the Big Tech Big Media
- Nuke Accidents 101
- Hormesis Is a Lie
- Renewable Energy PV
- Carrington Event and Space Weather Resources
- Rad Maps, Earthquakes, Nuke Bombs, High Quality Pictures
- Chernobyl Documentary 500K
- Home
- Conversions / Safety Limits
- 2020 Corona Virus Resources
- Prepper/Survival Resources And Protection from Radiation
Please share far and wide!
Search This Blog
Friday, July 20, 2012
OH Yeah, Soup up those Clunkers!
The Nuclear Regulatory Commission (NRC) on July 19 approved a request by Entergy Operations Inc. to increase the power generating capacity of Unit 1 at the Grand Gulf Nuclear Station by 15 percent. The power uprate for the boiling water reactor will increase the plant’s power generating capacity from about 1,300 to 1,500 MWe.
Subscribe to:
Post Comments (Atom)
Speaking of corrupt....seems like whenever I hear of an especially bad US nuke plant, the name Entergy also comes us.
ReplyDeleteCould it be they are greedy and reckless, buying up clunkers and then trying to get power uprates. YEAH! soup up those clunkers...
http://www.southbendtribune.com/news/sbt-michigan-reminds-people-near-palisades-about-pills-20120720,0,3460133.story