Please share far and wide!

Search This Blog

Thursday, August 31, 2017

Video Parody: Hilarious -- Hitler Attacks Nuclear Shills, Fukushima, WIPP It Good

Sociopaths won't understand the humor in here, so need not apply.

The author of this video dropped a comment below and this link

https://www.youtube.com/watch?v=IUMQz8OGKHo

Monday, August 28, 2017

Texas Nuke Plant REfuses to Shut Down -- Despite USGS Predictions of nearby River Flooding Above Their Design Basis

South Texas Nuke Plant (STP) is just a small part of electricity production in Texas.

Natural Gas Fired plants are 10 times larger, around 25800 MegaWatts.     STP is just 2500 MW.

Gas and coal plants are shutting down for safety.    But the dying nuclear industry refuses to give up even a day of profits, as Biblical storms pound Texas.

The "Design Basis Flood" of which engineering is done to protect from is 40.0 Mean Sea Level.   See second screen cap down.   Bay City is the nearest River Gauge Station.   They are predicting over 50 ' Mean Sea Level.     But no plans to shut down this nuclear plant.   

 
The Colorado River (of Texas) Basin is huge.   In the NRC Flood Risk Control documents they try to minimize the area of the Basin to make things "look better",   They cut the basin size by almost half.   My calcs show below show 13,389 Trillion gallons of water to hit that basin, using the proper area.
  















Hippie Dog said

Update: STP Nuke Plant In plain english…
We know that the STNPPL (South Texas Nuclear Power Plant Lake) WILL have problems….
We also KNOW the smaller "loop pond" will be inundated with flood waters…
And the flow pipe exit and intake gates in the small pond will be under water…
Seems clear this is a situation where running those reactors under those conditions is not only wrong it's a violation of both NUREG and state/federal law…
https://en.wikipedia.org/wiki/NUREG-1150
If you don't believe that look up willful child endangerment in the criminal code…
https://criminal-law.freeadvice.com/criminal-law/violent_crimes/felony-child-endangerment.htm
And endangerment of grandparents too..
https://en.wikipedia.org/wiki/Endangerment
Don't sit idly by while a major potential nuclear threat looms!!!!
SHUTDOWN THE STP NUCLEAR POWER PLANT NOW!!!!
A zoom-able satellite map:
https://zoom.earth/#28.775032,-96.050377,13z,map

---------------------------------------------------------------------------------------
HillbillyHoundDog
http://www.energycentral.com/news/stp-nuclear-operating-company-south-texas-project-units-1-and-2
The U.S. Nuclear Regulatory Commission (NRC) is granting exemptions from certain portions of the acceptance criteria for emergency core cooling, and the general design criteria for emergency core cooling, containment heat removal, and atmosphere cleanup for the use of a risk-informed analysis to evaluate the effects of debris in containment following a loss-of-coolant accident (LOCA) for the South Texas Project (STP), Units 1 and 2, located in Matagorda County, Texas, Docket Nos. 50-498 and 50-499, respectively. The exemptions are in response to a request dated June 19, 2013, from the STP Nuclear Operating Company (STPNOC, the licensee) related to STPNOC's proposed approach to resolve a generic safety concern for pressurized water reactors (PWRs) associated with potential clogging of emergency core cooling and containment spray system strainers during certain design basis events.
DATES: The exemption was issued on July 11, 2017.

  • HillbillyHoundDog HillbillyHoundDog
    Here's how to make it look good on paper…You all know if I took the time to look these "scientists" up, what would turn up…
    https://experts.illinois.edu/en/publications/risk-informed-resolution-of-generic-safety-issue-191
    This paper summarizes the elements of the integrative framework including PRA and the CASA Grande program, as well as the input parameters, assumptions, methodology, and results of the STPNOC analysis. The results show that the risk of core damage or large early release related to the concerns raised in GSI-191 in the as-built, as-operated design for STPNOC is very small (as defined in Regulatory Guide 1.174).

  • "safety concern for pressurized water reactors (PWRs) associated with potential clogging of emergency core cooling and containment spray system strainers during certain design basis events.
    DATES: The exemption was issued on July 11, 2017."
    Now let's all imagine the level of leaves, limbs, yard items, cans, plastic wrappers, building materials, car parts and other simple trash that is washing downstream NOW!!! (after the largest flood in recorded history).
    All this "stuff" (floating and submerged) is being carried down this river from points as far north as Austin and beyond… And it's all in that water that is inundating that nuclear plant, it's cooling supply pipes and many other systems…
    This ain't no dress rehearsal folks…
    SHUT DOWN THE STP NUCLEAR PLANT NOW!!!!!

  • jec jec
    Oh, "potential clogging of emergency core cooling and containment spray system strainers during certain design basis events". Would a 'certain design basis event(s)' be a FLOOD? Seems clogging and floods do seem to go together(there is a lot of junk in the water then to clog up filters!). And define 'very small'..wait we have go go find that Regulatory Guide 1.174 to see what they mean.
    Hope STPNOC has it right..seems strange exemption was granted finally after a 4 yr wait..just before major hurricane season hit..and while the GOM season was beginning.

    • In otherwords, believe its possible the STPNOC did nothing to remediate the emergency core cooling systems while they were waiting those four years??? Shouldnt they have completed the work and not waited for exemption approval. Wasnt work supposed to be done due to safety issues? Again,why wait four years..???


      What was provided to insure the exemption would be granted? Graft, corruption and greed comes to mind as an application for an exemption is just that, an 'application,' not permission to stop work on a safety requirement.



Are lawyers worried, no, professional courtesy

Friday, August 25, 2017

Your Gut / Immune System: Key to Fighting Disease Caused by Our Toxic Environment

 stock here--a few more articles here, lots of science going into Gut Microbiome, or Gut Flora.    This first study is interesting, but they also worry me a lot, but they seem to fall into the classic food triangle trap.

If someone is eating plants, they assume that its "the fiber" which causes broad based gut flora.     Keep in mind, fiber is not at all like fibrous material in a plant, if you don't get that, Google it.

And if someone is eating animals, they assume that it is the fat in the animals that causes decreased Gut Flora.

And they further make the assertation that "the further away from a Western diet, the greater the variety of microbes."    2 problems there, the "Western Diet" is very broad and varies quite a bit in different regions.      2nd issue is that it is not what is eaten in the Western diet, it is the amount of toxins, radiation, degree of processing, use of MSG, high fructose corn syrup, processed salts and sugars, bleached wheat----these are the things that really matter. 

One connection that failed to even discuss, are these studied people any more healthy>


http://www.npr.org/sections/goatsandsoda/2017/08/24/545631521/is-the-secret-to-a-healthier-microbiome-hidden-in-the-hadza-diet

----------------------------------------------------------------

"Gut Flora" Now Going Mainstream As It Should -- Huff Post

I don't often read Huff Post.    I used to, and used to participate in numerous discussions.   Of course Huff Post is as slanted far left as you can get, that is not me.    So I tried to have discussion, and understand positions.    It was pretty useless, maybe only 1 person of 100 would even consider facts that I brought to the table.

But in researching the "Russia Did It" meme I ran across some interesting stuff at Huff.

It's title leans heavy on the "New Years Resolution Diet" and the idea that you may fail...not because it's your fault....but because you just have the wrong bacteria in your gut.

Your Microbiome May Determine Whether Your Diet Succeeds Or Fails

It's a good article, because it is bringing important information to the forefront, mainstream.   But as with all scientific documents I have searched, it falls far short of providing specific actionable information.  

One of the cited authors appears to push her "plant based food" agenda, saying:
“When you look at populations that eat real food that’s high in fiber, and more plant-based foods, you’re going to see they have a more robust microbiota, with more genetic diversity, healthier species and fewer pathogenic bacteria living in the gut

So it's the "fiber" push --- which is fine, but comes without any justification.   

And "no one" knows how long corrective actions will take.     Or how much "fermented foods" are needed.

LOL "Even I" the Nukepro, do not know how much pro-biotic foods are "necessary".   I do try to eat 3 pro-biotic things almost every day.    Specifically, actively fermented stuff, not just "high fiber vegetables".

This article says that stress can alter your gut flora, decreasing good bacteria, and increasing bad, with a negative affect on the immune system.

 https://www.sciencedaily.com/releases/2011/03/110321094231.htm

 And this decidedly more scientific study link gut flora and mental health.    Is there anything good gut flora cannot do?


Fermented foods, microbiota, and mental health: ancient practice meets nutritional psychiatry

 http://jphysiolanthropol.biomedcentral.com/articles/10.1186/1880-6805-33-2


------------------------------------------------------------
Then we touch on the related issue "Pre-biotics" just throwing that out there, and not schooled up on it yet.

What should be clear is that America, with one of the worst diets in the world, which allows far more types of GMO, GE, pesticides and herbicides than many countries, has lousy health, absurd health care costs, and poor results.

The average life span in USA is now decreasing.    At what point, if ever, do we reach a tipping point, a point of DISGUST in which effective action will occur on a large scale?

------------------------------------
Heres a good one that starts with a strong statement

https://www.ncbi.nlm.nih.gov/pubmed/24336217/

Diet rapidly and reproducibly alters the human gut microbiome.

But looking at the data, we see a very limited study of only 4 days of diet, and the 2 groups were either strictly plant or strictly animal based.    An obvious 3rd group to study would be a diet based plants and animals and supplemented by 3 types of pro-biotic fermented foods.

 

---------------------------------------------------------------

And here is a weak at best quote

Much of the composition of the microbiome is established early in life, shaped by forces like your genetics and whether you were breast-fed or bottle-fed 

 Sheesh, of course for the baby, that is true.    But the implication is that your gut flora is then pretty much set for life, and nothing is further from the truth.    Nor do I believe genetics has much to do with it.     It's shameful writing, without understanding.

New York Times

http://www.nytimes.com/2016/12/29/well/eat/a-gut-makeover-for-the-new-year.html?rref=collection%2Fsectioncollection%2Fhealth&action=click&contentCollection=health&region=rank&module=package&version=highlights&contentPlacement=2&pgtype=sectionfront

Thursday, August 24, 2017

Media Deception --"Negative Hallucination", Programmed to Delete Via Focus, Memory Hole

"Negative Hallucination" hypnosis experiment - MUST SEE from NaturalNews on Vimeo.

-------------------------

much of what we were informed about Lincoln was pretty much bunk.

http://www.paulcraigroberts.org/2017/08/21/lincoln-myth-ideological-cornerstone-america-empire/
“Lincoln is theology, not historiology. He is a faith, he is a church, he is a religion, and he has his own priests and acolytes, most of whom . . . are passionately opposed to anybody telling the truth about him . . . with rare exceptions, you can’t believe what any major Lincoln scholar tells you about Abraham Lincoln and race.” –Lerone Bennett, Jr., Forced into Glory, p. 114 The author of the above quotation, Lerone Bennett, Jr., was the executive editor of Ebony magazine for several decades, beginning in 1958.

He is a distinguished African-American author of numerous books, including a biography of Martin Luther King, Jr. He spent twenty years researching and writing his book, Forced into Glory: Abraham Lincoln’s White Dream, from which he drew the above conclusion about the so-called Lincoln scholars and how they have lied about Lincoln for generations.

For obvious reasons, Mr. Bennett is incensed over how so many lies have been told about Lincoln and race.

Wednesday, August 23, 2017

Nuclear Waste: Last Week Tonight with John Oliver

Published on Aug 20, 2017
Nuclear waste poses a serious threat to public health if it's not stored in a safe place. John Oliver explains why the United States desperately needs to build a metaphorical toilet for all that waste.

Connect with Last Week Tonight online...

Fukushima Reactor 3, a News History Timeline. It's MSM But It's Useful

Fukushima Daiichi Nuclear Power Station Unit -3

Posting date
title
August 2, 2017 Fukushima Daiichi Nuclear Power Station Unit 3 Reactor building Building installation cover for fuel removal (on-site release)
July 31, 2017 Fukushima Daiichi Nuclear Power Station Unit 3 Reactor Building Fuel removal cover etc. Installation work
July 27, 2017 Fukushima Daiichi Nuclear Power Station Unit 3 Measurement of Fuel Debris Position in Furnace by Muon Measurement Measurement Status (Interim Report)
July 22, 2017 Progress of PCV internal survey of Unit 3 ~ Disaster survey on 22nd ~
July 21, 2017 Progress of internal PCV survey of Unit 3 ~ Disaster survey on 21st ~
July 19, 2017 Unit 3 PCV internal survey progress ~ 19th bulletin survey ~
March 2, 2017 Cover etc. for installation of fuel for Unit 3 Installation Start of construction of FHM girder steel frame
February 22, 2017 Status of applicability test by multicopter "RISER" in Turbine Building Operational Fuel Unit 3
February 21, 2017 Status of applicability test by multicopter "RISER" in Unit 3 backwash valve pit
February 7, 2017 Cover installation of Unit 3 fuel takeout cover Installation of west side stopper
January 17, 2017 About the start of installation of cover for fuel removal at Fukushima Daiichi Nuclear Power Station Unit 3
12th April 2016 About installation of shields on Unit 3 Reactor Building Operation Floor
February 23, 2016 About decontamination by high-density dry ice blast decontamination equipment
December 25, 2015 On the status of performance confirmation of dry ice blast decontamination equipment for altitude
November 27, 2015 Unit 3 containment vessel (PCV) equipment hatch survey using small research equipment (robot)
October 22, 2015 Results of internal survey of Fukushima Daiichi Nuclear Power Station Unit 3 Reactor Containment Vessel (PCV) (Preliminary Report: Execution on October 22)
20th October 2015 Result of the internal survey of Fukushima Daiichi Nuclear Power Station Unit 3 Reactor Containment Vessel (PCV) (preliminary report: implementation on October 20)
October 16, 2015 Survey result by underwater camera in spent fuel pool of Unit 3 of Fukushima Daiichi Nuclear Power Station Unit 3
September 9, 2015 About the results of PCV equipment hatch survey by Fukushima Daiichi Nuclear Power Station Unit 3 small camera
August 31, 2015 About cover construction for Fukushima Daiichi Nuclear Power Station Unit 3 Reactor Building Fuel Removal
August 27, 2015 About completion of filling in the seawater piping trench of Fukushima Daiichi Nuclear Power Station Unit 3
August 4, 2015 (2015/8/5 video addition) Internal survey in Unit 3 spent fuel pool
August 2, 2015 Fukushima Daiichi Nuclear Power Station Unit 3 completion of removal of fuel exchanger from spent fuel pool
30th July 2015 Image of Fukushima Daiichi Nuclear Power Station Unit 3 Fuel Handling Machine Removal Operation
February 5, 2015 Unit 3 seawater piping trench filling work situation
October 16, 2014 Start of Fujishima Daiichi Nuclear Power Station Units 2 and 3 Seawater piping trench building connection section waterproof construction progress filling filling work
September 1, 2014 Fukushima Daiichi Nuclear Power Station Unit 3 Fall of the fuel exchanger operation console during the work of removing the gallekes in the spent fuel pool (Survey result)
30th August 2014 Fukushima Daiichi Unit 3 On Fall of Operation Console of Fuel Exchanger during Rubble Removal Work in Spent Fuel Pool (Survey Results Using Underwater Camera)
August 29, 2014 Fukushima Daiichi Unit 3 Fall Switches During the removal of debris in the spent fuel pool Operation Console falling [9/1 video addition]
August 19, 2014 Progress of waterproof construction of Units 2 and 3 seawater piping trench building connection part
July 11, 2014 On the results of the investigation of the situation of the subordinate part of the Northwestern Collapse of Reactor Building No. 3 of Fukushima Daiichi Nuclear Power Station Unit 3
July 7, 2014 Progress status of Fukushima Daiichi Nuclear Power Station Units 2 and 3 Seawater piping trench building connection water stop construction
20th June 2014 Commencement of decontamination in the building by remote decontamination equipment on the 1st floor of Fukushima Daiichi Nuclear Power Station Unit 3 Reactor Building
May 15, 2014 Fukushima Daiichi Nuclear Power Station Unit 3 Main Steam Isolation Valve (MSIV) Indoor Survey Result (3rd) <Breaking News>
April 24, 2014 About the preliminary survey of the Unit 3 main steam isolation valve (MSIV) (preliminary report of April 23)
February 14, 2014 About the results of the building framework survey after removing the upper garret in the reactor building of Fukushima Daiichi Nuclear Power Station Unit 3
January 21, 2014 Water Leakage near Main Steam Isolation Valve Room on Unit 3 Reactor Building 1st Floor (Situation on 21st January)
January 18, 2014 Water Leakage near Main Steam Isolation Valve Room on Unit 3 Reactor Building 1st Floor
October 16, 2013 Fukushima Daiichi Nuclear Power Station Unit 3 Refueling of upper reactor debris About completion of removal of large-sized debris and implementation of dose reduction measures
September 24, 2013 Fukushima Daiichi Nuclear Power Station Unit 3 Reactor Building Remotely Controlled Large Crane About Tilting of the Jib Mast [Cause and Countermeasures]
September 10, 2013 Fukushima Daiichi Nuclear Power Station Unit 3 Reactor Building Remotely Controlled Large Crane Tip Jib Mast · Main Mast Landing Operation
September 5, 2013 Fukushima Daiichi Nuclear Power Station Unit 3 Reactor removal work on the reactor building Large crane tip jib mast About occurrence of tilting
August 26, 2013 Withdrawal of obstacles such as garage in southwest area of ​​Fukushima Daiichi Nuclear Power Station Unit 3 Reactor Building 1st Floor
August 6, 2013 (Confirmation of steam: 8 o'clock on July 26, 2013) About confirmation of steam near the central part of Fukushima Daiichi Nuclear Power Station Unit 3 reactor building 5 (equipment storage pool side)
August 6, 2013 (Confirmation of steam: 7:00 on July 25, 2013) About confirmation of steam near the central part of Fukushima Daiichi Nuclear Power Station Unit 3 reactor building 5 (equipment storage pool side)
August 6, 2013 (Confirmation of steam: 12 o'clock on July 24, 2013) About confirmation of steam at the central part of Fukushima Daiichi Nuclear Power Station Unit 3 reactor building 5 (equipment storage pool side)
August 6, 2013 (Confirmation of steam: 9 o'clock on July 23, 2013) About confirmation of steam at the central part of Fukushima Daiichi Nuclear Power Station Unit 3 reactor building 5 (the equipment storage pool side)
July 26, 2013 About removal work of obstacles such as garage etc. on Fukushima Daiichi Nuclear Power Station Unit Unit 3 Reactor Building 1st Floor
July 24, 2013 About upper infrared thermography measurement of Fukushima Daiichi Nuclear Power Station Unit 3 Reactor Building
July 24, 2013 About atmospheric dosimetry around the shield plug of Fukushima Daiichi Nuclear Power Station Unit 5, 5 th Floor
July 22, 2013 About upper infrared thermography measurement of Fukushima Daiichi Nuclear Power Station Unit 3 Reactor Building
July 18, 2013 Confirmation of steaming at the central part of Fukushima Daiichi Nuclear Power Station Unit 3 Reactor Building 5 (the equipment storage pool side)
May 27, 2013 Fukushima Daiichi Nuclear Power Station Unit 3 Refueling of upper reactor debris About renewal of spent fuel storage pool and updating of the skimmer surge tank hatch
April 22, 2013 Fukushima Daiichi Nuclear Power Station Unit 3 Reactor building removal work at the reactor building
April 19, 2013 On the situation of the skimmer surge tank hatch at the time of removing debris from the upper part of the nuclear reactor building at Fukushima Daiichi Nuclear Power Station Unit 3
April 15, 2013 Factory analysis and countermeasures for suspension of spent fuel pool circulation cooling facility at Fukushima Daiichi Nuclear Power Station Unit 3
5th April 2013 About stop of Fukushima Daiichi Nuclear Power Station Unit 3 spent fuel pool alternative cooling system
March 4, 2013 About completion of water stop construction work on the water inlet part to the underground storage building of Unit 3 of Fukushima Daiichi Nuclear Power Station Unit 3
February 21, 2013 Survey result by underwater camera in spent fuel pool of Fukushima Daiichi Nuclear Power Station Unit 3 (February 14, 15, 16, 18)
February 13, 2013 Survey of spent fuel pool by underwater camera in construction of upper rubble of Reactor Building No. 3 of Fukushima Dai-ichi NPS
February 8, 2013 On the possibility of submergence of debris that seems to be a fuel exchanger mast in the construction work of the upper debris of reactor building Fukushima Daiichi Nuclear Power Station Unit 3
February 6, 2013 Fukushima Daiichi Nuclear Power Station Unit 3 Reactor Rubble Removal Work of Reactor Building About Removal of Steel Truss Debris
February 1, 2013 Picture of grasping the situation of Fukushima Daiichi Nuclear Power Plant Accident (released February 1, 2013)
January 28, 2013 Fukushima Daiichi Nuclear Power Station Unit 3 PCV Gas Management System Part of piping Steel tubing · System shutdown due to remodeling of control panel
20th December 2012 Fukushima Daiichi Nuclear Power Station Unit 3 Reactor for removing upper rubble of reactor building With regard to removal of rubble of submerged steel frame
December 19, 2012 Fukushima Daiichi Nuclear Power Station Unit 3 Reactor for removing the upper rubble of the reactor building About the removal of the debris from the submerged steel
12th December 2012 About leakage occurrence situation in the turbine building of Unit 3 of Fukushima Dai-ichi NPS
5th December 2012 About the completion of waterproofing construction of Fukushima Daiichi Nuclear Power Station Unit 3 control building
November 28, 2012 About the result of checking the status of the Fukushima Daiichi Nuclear Power Station Unit 3 reactor containment vessel (PCV) gas management system duct
November 27, 2012 On the Increase of Water Injection Volume at Fukushima Daiichi Nuclear Power Station Unit 3
November 27, 2012 Fukushima Daiichi Nuclear Power Station Unit 3 Survey results on sputter fuel pool salt removal equipment (Mobile RO) stoppage and hydrochloric acid leakage
November 26, 2012 About confirming the status of the PCV gas management system duct Unit 3 of Fukushima Daiichi Nuclear Power Station Unit 3
November 14, 2012 About the contents of "Report on the facility management plan based on the concept of" securing medium-term security "for Fukushima Daiichi Nuclear Power Plant No. 1 to 4
October 24, 2012 About the leakage of hydrochloric acid from the Fukushima Daiichi Nuclear Power Station Unit 3 spent fuel pool salt removal device (mobile RO)
15th October 2012 About water leakage in turbine building of Unit 3 of Fukushima Dai-ichi NPS
15th October 2012 Survey status by underwater camera in spent fuel pool of Unit 3 of Fukushima Daiichi Nuclear Power Station Unit (October 11 and 12)
October 3, 2012 Report on the Nuclear Regulatory Commission to the instruction document on the fall of steel scraps in the spent fuel storage pool of Fukushima Daiichi Nuclear Power Station Unit 3
September 26, 2012 Survey status by underwater camera in spent fuel pool of Fukushima Daiichi Nuclear Power Station Unit No. 3 (for September 26)
September 25, 2012 Survey status by underwater camera in spent fuel pool of Fukushima Dai-ichi NPS 3
September 24, 2012 Fukushima Daiichi Nuclear Power Station Unit 3 spent fuel pool debris removal work
September 13, 2012 On the internal investigation of the spent fuel pool towards the removal of the upper galleki of reactor building No. 3 of Fukushima Daiichi Nuclear Power Station Unit 3
September 11, 2012 On the decrease of the water injection volume of Units 1 to 3 of Fukushima Daiichi Nuclear Power Station (2nd report)
September 11, 2012 (32) Ultra high pressure switchgear area 3 and 4 (indoor)
September 11, 2012 (31) Ultra high pressure switchgear area 3 and 4 (outdoor)
September 11, 2012 (15) Damaged condition in the premises after the explosion of Units 1, 3, 4
September 11, 2012 (8) Exterior of Unit 3 after Explosion and Appearance of Unit 4 before Explosion as seen from Unit 3
September 10, 2012 Present status of Fukushima Daiichi Nuclear Power Station shown in the photograph
September 5, 2012 About the decrease event of the water injection flow rate of Fukushima Daiichi Nuclear Power Station No. 1 to 3
July 13, 2012 Fukushima Daiichi Nuclear Power Station Unit 3 Expansion Waste Regarding the accumulated water confirmed in the underground storage building
July 13, 2012 【Motion picture】 Survey result of surrounding situation around Fukushima Dai-ichi NPS 3 Unit Reactor Building Operating Floor
July 12, 2012 On the results of the Torus Indoor Survey on the Basement Fukushima Daiichi Nuclear Power Station Unit 3 Reactor Building Underground Floor
July 11, 2012 Survey results on surrounding conditions around the Fukushima Daiichi Nuclear Power Station Unit 3 Reactor Building Operator Floor
July 5, 2012 "Development of Remote Decontamination Technique in Building" On the Results of Robot Survey of Unit 2 and 3 Reactor Buildings
June 26, 2012 Present status of Fukushima Daiichi Nuclear Power Station shown in the photograph
25th June 2012 About construction of water stop part water stop to underground storage building of Fukushima Daiichi Nuclear Power Station Unit 3 Unit 3
19th June 2012 Duct damage of Fukushima Daiichi Nuclear Power Station Unit 3 reactor containment gas gas management system
7th June 2012 Water level measurement result of Fukushima Daiichi Nuclear Power Station 2, 3 Torus Room
May 30, 2012 On Fukushima Daiichi Nuclear Power Station Unit 3 Waste In-situ Survey Results of Pumped Water in Underground Storage Building (May 28 - 29)
May 24, 2012 Fukushima Daiichi Nuclear Power Station Unit 3 Reactor Building 1st Floor TIP Indoor Environmental Survey Result (conducted May 23, 2012)
20th April 2012 Nitrogen gas separation device (PSA-3 PSA-4) cause investigation early response policy at failure
20th April 2012 [Video] About investigation of Unit 3 Fukushima Dai-ichi NPS Nuclear Containment Equipment Hatch
April 19, 2012 About investigation of Unit 3 reactor containment vessel equipment hatch of Fukushima Dai-ichi NPS
April 16, 2012 About stop of nitrogen gas separator (PSA)
April 16, 2012 [Video] Internal survey aimed at removing rubble from spent fuel pool at Fukushima Daiichi Nuclear Power Station Unit 3
April 13, 2012 On the internal investigation towards the removal of the spare fuel pool of the Fukushima Daiichi Nuclear Power Station Unit 3 Unit 3
March 16, 2012 About the preliminary survey of Fukushima Daiichi 2, 3 torus room (2)
March 15, 2012 Access survey of Fukushima Daiichi Nuclear Power Station Units 2 and 3 Torus Room (Movie)
March 14, 2012 About the preliminary survey of Fukushima Daiichi Nos. 2 and 3 torus room
February 24, 2012 TEPCO's Fukushima Daiichi Nuclear Power Plant Preparation for Fuel Debris Entry Preparation for Decommissioning Measures etc. Technical Catalog Related to the Development of Devices, etc. Explanation Materials in Workshop
January 29, 2012 On the 29th of January on the water leak condition at Fukushima Daiichi Nuclear Power Station
January 26, 2012 Response training on occurrence of abnormal spent fuel pool based on safety preservation
20th January 2012 Present status of Fukushima Daiichi Nuclear Power Station shown in the photograph
January 16, 2012 Lifting landscape Implementation work for removing obstructions of Units 1 to 4 by taking a watercraft
December 24, 2011 On the swelling of the reactor water injection hose of Unit 3 of Fukushima Dai-ichi NPS
December 17, 2011 Current status of Fukushima Dai-ichi NPS
November 30, 2011 About establishing a nitrogen inclusion route into the reactor pressure vessel (RPV) of Fukushima Daiichi Nuclear Power Station Units 1 to 3
November 22, 2011 Measurement of ambient dose by reactor nuclear reactor robot Unit 3 of Fukushima Dai-ichi NPS
November 16, 2011 Fukushima Daiichi Nuclear Power Station Unit 3 Reactor Building Building Investigation · Cleaning
November 8, 2011 Situation on the south side of Fukushima Daiichi Nuclear Power Station Unit 3 reactor building building opening
November 5, 2011 Measurement of dose after movement of interfering substances on the passage and movement of interfering substances by robot at Unit 3 Reactor Building 1st Floor
October 22, 2011 Fukushima Daiichi Nuclear Power Station Unit 3 Reactor Building Equipment Hatch opening
15th October 2011 Fukushima Daiichi Nuclear Power Station Temperature measurement result directly above the nuclear reactor by infrared camera
October 8, 2011 Status of Fukushima Daiichi Nuclear Power Station No. 3 Reactor Building Top
October 8, 2011 Present status of Fukushima Daiichi Nuclear Power Station shown in the photograph
October 1, 2011 About the outline of the dust collector system
October 1, 2011 Present status of Fukushima Daiichi Nuclear Power Station shown in the photograph
September 28, 2011 Fukushima Daiichi Nuclear Power Station Unit 2 JAEA-3 entrance scenery inside reactor building Landscape in Unit 3 Reactor Building
September 24, 2011 Status of Fukushima Daiichi Nuclear Power Station No. 3 Reactor Building Top
September 13, 2011 Fukushima Daiichi Nuclear Power Station Unit 3 Reactor Building Opening Dust sampling scenery
September 10, 2011 Fukushima Daiichi Nuclear Power Station No.1, Unit 3 Reactor Building Opening Dust Sampling Equipment
September 9, 2011 Photo of Fukushima Daiichi Nuclear Power Station
August 25, 2011 Fukushima Daiichi Nuclear Power Station Unit 3 Reactor Building Opening Dust sampling scenery
August 1, 2011 Small glasses on the west side of Fukushima Daiichi Nuclear Power Station Unit 3 reactor building, Gravel near the large-sized entrance of Unit 2 Reactor Building Building
July 28, 2011 Video of Quince entry area at Unit 3 Fukushima Daiichi Nuclear Power Plant reactor building
July 27, 2011 Field survey by Quince of Unit 3 Fukushima Daiichi Nuclear Power Station Unit
July 18, 2011 Work situation of the Fukushima Daiichi Nuclear Power Station Unit 3 turbine building roof installation work
July 17, 2011 Unit 3 of Fukushima Daiichi Nuclear Power Station Roofscape with rainwater countermeasure
July 4, 2011 Status of iron plate laying on the 1st floor of Fukushima Daiichi Nuclear Power Station Unit 3 Reactor Building
July 2, 2011 Cleaning work by Fukushima Daiichi Nuclear Power Station Unit 3 reactor building robot
30th June 2011 Cleaning system of Fukushima Daiichi Nuclear Power Station Unit 3, 1st floor
15th June 2011 Dose Survey Results in Unit 3 Fukushima Daiichi Nuclear Power Station Reactor Building
14th June 2011 Sampling situation of radioactive materials in the air at the Fukushima Daiichi Nuclear Power Plant upper part of the reactor building (Unit 3)
11th June 2011 Fukushima Daiichi Nuclear Power Station Unit 3 Reactor Building
5th June 2011 High dose of debris on the west side of Fukushima Daiichi Nuclear Power Station Unit 3 reactor building
May 27, 2011 IAEA visit Fukushima
May 21, 2011 Status of the Fukushima Daiichi Nuclear Power Station Unit 3 Near the reactor building (rubble)
May 17, 2011 Recovery situation of Fukushima Daiichi Nuclear Power Station
May 11, 2011 Status of water stop in the vicinity of Fukushima Daiichi Nuclear Power Station Unit 3 intake port
May 11, 2011 Inflow situation in the pit near the Fukushima Daiichi Nuclear Power Station Unit 3 intake port
May 10, 2011 Status of the Spent Fuel Pool at Fukushima Daiichi Nuclear Power Station Unit 3
20th April 2011 Fukushima Daiichi Nuclear Power Station Photographed image (packed image) by pack bot in reactor building
April 19, 2011 Photo taken by pack bot in Fukushima Dai-ichi Nuclear Power Station reactor building (photo)
April 17, 2011 Fukushima Daiichi Nuclear Power Station Unit 3 Pak Bot Work in Nuclear Power Building
April 16, 2011 Photographed images from T-Hawk (No. 1, No. 3, No. 4)
15th April 2011 Fukushima Daiichi Nuclear Power Station Unit 3 Spent fuel pool Concrete pump car photographed image
12th April 2011 Fukushima Daiichi Nuclear Power Station discharge port sampling Building fire, water intake port pre-installation plate work situation, sampling of spent fuel pool water
11th April 2011 Fukushima Daiichi Nuclear Power Station Aerial shooting and equipment / work
March 23rd, 2011 Central control office of Fukushima Daiichi Nuclear Power Station
March 21, 2011 Fukushima Daiichi Nuclear Power Station Unit 3
March 17, 2011 Fukushima Daiichi Nuclear Power Station Units 3 and 4 (Aerial shooting)