|   August 2, 2017  |    Fukushima Daiichi Nuclear Power Station Unit 3 Reactor building Building installation cover for fuel removal (on-site release)  | 
|   July 31, 2017  |    Fukushima Daiichi Nuclear Power Station Unit 3 Reactor Building Fuel removal cover etc. Installation work  | 
|   July 27, 2017  |    Fukushima
 Daiichi Nuclear Power Station Unit 3 Measurement of Fuel Debris 
Position in Furnace by Muon Measurement Measurement Status (Interim 
Report)  | 
|   July 22, 2017  |    Progress of PCV internal survey of Unit 3 ~ Disaster survey on 22nd ~  | 
|   July 21, 2017  |    Progress of internal PCV survey of Unit 3 ~ Disaster survey on 21st ~  | 
|   July 19, 2017  |    Unit 3 PCV internal survey progress ~ 19th bulletin survey ~  | 
|   March 2, 2017  |    Cover etc. for installation of fuel for Unit 3 Installation Start of construction of FHM girder steel frame  | 
|   February 22, 2017  |    Status of applicability test by multicopter "RISER" in Turbine Building Operational Fuel Unit 3  | 
|   February 21, 2017  |    Status of applicability test by multicopter "RISER" in Unit 3 backwash valve pit  | 
|   February 7, 2017  |    Cover installation of Unit 3 fuel takeout cover Installation of west side stopper  | 
|   January 17, 2017  |    About the start of installation of cover for fuel removal at Fukushima Daiichi Nuclear Power Station Unit 3  | 
|   12th April 2016  |    About installation of shields on Unit 3 Reactor Building Operation Floor  | 
|   February 23, 2016  |    About decontamination by high-density dry ice blast decontamination equipment  | 
|   December 25, 2015  |    On the status of performance confirmation of dry ice blast decontamination equipment for altitude  | 
|   November 27, 2015  |    Unit 3 containment vessel (PCV) equipment hatch survey using small research equipment (robot)  | 
|   October 22, 2015  |    Results
 of internal survey of Fukushima Daiichi Nuclear Power Station Unit 3 
Reactor Containment Vessel (PCV) (Preliminary Report: Execution on 
October 22)  | 
|   20th October 2015  |    Result
 of the internal survey of Fukushima Daiichi Nuclear Power Station Unit 3
 Reactor Containment Vessel (PCV) (preliminary report: implementation on
 October 20)  | 
|   October 16, 2015  |    Survey result by underwater camera in spent fuel pool of Unit 3 of Fukushima Daiichi Nuclear Power Station Unit 3  | 
|   September 9, 2015  |    About the results of PCV equipment hatch survey by Fukushima Daiichi Nuclear Power Station Unit 3 small camera  | 
|   August 31, 2015  |    About cover construction for Fukushima Daiichi Nuclear Power Station Unit 3 Reactor Building Fuel Removal  | 
|   August 27, 2015  |    About completion of filling in the seawater piping trench of Fukushima Daiichi Nuclear Power Station Unit 3  | 
|   August 4, 2015  |    (2015/8/5 video addition) Internal survey in Unit 3 spent fuel pool  | 
|   August 2, 2015  |    Fukushima Daiichi Nuclear Power Station Unit 3 completion of removal of fuel exchanger from spent fuel pool  | 
|   30th July 2015  |    Image of Fukushima Daiichi Nuclear Power Station Unit 3 Fuel Handling Machine Removal Operation  | 
|   February 5, 2015  |    Unit 3 seawater piping trench filling work situation  | 
|   October 16, 2014  |    Start
 of Fujishima Daiichi Nuclear Power Station Units 2 and 3 Seawater 
piping trench building connection section waterproof construction 
progress filling filling work  | 
|   September 1, 2014  |    Fukushima
 Daiichi Nuclear Power Station Unit 3 Fall of the fuel exchanger 
operation console during the work of removing the gallekes in the spent 
fuel pool (Survey result)  | 
|   30th August 2014  |    Fukushima
 Daiichi Unit 3 On Fall of Operation Console of Fuel Exchanger during 
Rubble Removal Work in Spent Fuel Pool (Survey Results Using Underwater 
Camera)  | 
|   August 29, 2014  |    Fukushima
 Daiichi Unit 3 Fall Switches During the removal of debris in the spent 
fuel pool Operation Console falling [9/1 video addition]  | 
|   August 19, 2014  |    Progress of waterproof construction of Units 2 and 3 seawater piping trench building connection part  | 
|   July 11, 2014  |    On
 the results of the investigation of the situation of the subordinate 
part of the Northwestern Collapse of Reactor Building No. 3 of Fukushima
 Daiichi Nuclear Power Station Unit 3  | 
|   July 7, 2014  |    Progress
 status of Fukushima Daiichi Nuclear Power Station Units 2 and 3 
Seawater piping trench building connection water stop construction  | 
|   20th June 2014  |    Commencement
 of decontamination in the building by remote decontamination equipment 
on the 1st floor of Fukushima Daiichi Nuclear Power Station Unit 3 
Reactor Building  | 
|   May 15, 2014  |    Fukushima
 Daiichi Nuclear Power Station Unit 3 Main Steam Isolation Valve (MSIV) 
Indoor Survey Result (3rd) <Breaking News>  | 
|   April 24, 2014  |    About the preliminary survey of the Unit 3 main steam isolation valve (MSIV) (preliminary report of April 23)  | 
|   February 14, 2014  |    About
 the results of the building framework survey after removing the upper 
garret in the reactor building of Fukushima Daiichi Nuclear Power 
Station Unit 3  | 
|   January 21, 2014  |    Water Leakage near Main Steam Isolation Valve Room on Unit 3 Reactor Building 1st Floor (Situation on 21st January)  | 
|   January 18, 2014  |    Water Leakage near Main Steam Isolation Valve Room on Unit 3 Reactor Building 1st Floor  | 
|   October 16, 2013  |    Fukushima
 Daiichi Nuclear Power Station Unit 3 Refueling of upper reactor debris 
About completion of removal of large-sized debris and implementation of 
dose reduction measures  | 
|   September 24, 2013  |    Fukushima
 Daiichi Nuclear Power Station Unit 3 Reactor Building Remotely 
Controlled Large Crane About Tilting of the Jib Mast [Cause and 
Countermeasures]  | 
|   September 10, 2013  |    Fukushima
 Daiichi Nuclear Power Station Unit 3 Reactor Building Remotely 
Controlled Large Crane Tip Jib Mast · Main Mast Landing Operation  | 
|   September 5, 2013  |    Fukushima
 Daiichi Nuclear Power Station Unit 3 Reactor removal work on the 
reactor building Large crane tip jib mast About occurrence of tilting  | 
|   August 26, 2013  |    Withdrawal
 of obstacles such as garage in southwest area of Fukushima Daiichi 
Nuclear Power Station Unit 3 Reactor Building 1st Floor  | 
|   August 6, 2013  |    (Confirmation
 of steam: 8 o'clock on July 26, 2013) About confirmation of steam near 
the central part of Fukushima Daiichi Nuclear Power Station Unit 3 
reactor building 5 (equipment storage pool side)  | 
|   August 6, 2013  |    (Confirmation
 of steam: 7:00 on July 25, 2013) About confirmation of steam near the 
central part of Fukushima Daiichi Nuclear Power Station Unit 3 reactor 
building 5 (equipment storage pool side)  | 
|   August 6, 2013  |    (Confirmation
 of steam: 12 o'clock on July 24, 2013) About confirmation of steam at 
the central part of Fukushima Daiichi Nuclear Power Station Unit 3 
reactor building 5 (equipment storage pool side)  | 
|   August 6, 2013  |    (Confirmation
 of steam: 9 o'clock on July 23, 2013) About confirmation of steam at 
the central part of Fukushima Daiichi Nuclear Power Station Unit 3 
reactor building 5 (the equipment storage pool side)  | 
|   July 26, 2013  |    About
 removal work of obstacles such as garage etc. on Fukushima Daiichi 
Nuclear Power Station Unit Unit 3 Reactor Building 1st Floor  | 
|   July 24, 2013  |    About upper infrared thermography measurement of Fukushima Daiichi Nuclear Power Station Unit 3 Reactor Building  | 
|   July 24, 2013  |    About atmospheric dosimetry around the shield plug of Fukushima Daiichi Nuclear Power Station Unit 5, 5 th Floor  | 
|   July 22, 2013  |    About upper infrared thermography measurement of Fukushima Daiichi Nuclear Power Station Unit 3 Reactor Building  | 
|   July 18, 2013  |    Confirmation
 of steaming at the central part of Fukushima Daiichi Nuclear Power 
Station Unit 3 Reactor Building 5 (the equipment storage pool side)  | 
|   May 27, 2013  |    Fukushima
 Daiichi Nuclear Power Station Unit 3 Refueling of upper reactor debris 
About renewal of spent fuel storage pool and updating of the skimmer 
surge tank hatch  | 
|   April 22, 2013  |    Fukushima Daiichi Nuclear Power Station Unit 3 Reactor building removal work at the reactor building  | 
|   April 19, 2013  |    On
 the situation of the skimmer surge tank hatch at the time of removing 
debris from the upper part of the nuclear reactor building at Fukushima 
Daiichi Nuclear Power Station Unit 3  | 
|   April 15, 2013  |    Factory
 analysis and countermeasures for suspension of spent fuel pool 
circulation cooling facility at Fukushima Daiichi Nuclear Power Station 
Unit 3  | 
|   5th April 2013  |    About stop of Fukushima Daiichi Nuclear Power Station Unit 3 spent fuel pool alternative cooling system  | 
|   March 4, 2013  |    About
 completion of water stop construction work on the water inlet part to 
the underground storage building of Unit 3 of Fukushima Daiichi Nuclear 
Power Station Unit 3  | 
|   February 21, 2013  |    Survey
 result by underwater camera in spent fuel pool of Fukushima Daiichi 
Nuclear Power Station Unit 3 (February 14, 15, 16, 18)  | 
|   February 13, 2013  |    Survey
 of spent fuel pool by underwater camera in construction of upper rubble
 of Reactor Building No. 3 of Fukushima Dai-ichi NPS  | 
|   February 8, 2013  |    On
 the possibility of submergence of debris that seems to be a fuel 
exchanger mast in the construction work of the upper debris of reactor 
building Fukushima Daiichi Nuclear Power Station Unit 3  | 
|   February 6, 2013  |    Fukushima
 Daiichi Nuclear Power Station Unit 3 Reactor Rubble Removal Work of 
Reactor Building About Removal of Steel Truss Debris  | 
|   February 1, 2013  |    Picture of grasping the situation of Fukushima Daiichi Nuclear Power Plant Accident (released February 1, 2013)  | 
|   January 28, 2013  |    Fukushima
 Daiichi Nuclear Power Station Unit 3 PCV Gas Management System Part of 
piping Steel tubing · System shutdown due to remodeling of control panel  | 
|   20th December 2012  |    Fukushima
 Daiichi Nuclear Power Station Unit 3 Reactor for removing upper rubble 
of reactor building With regard to removal of rubble of submerged steel 
frame  | 
|   December 19, 2012  |    Fukushima
 Daiichi Nuclear Power Station Unit 3 Reactor for removing the upper 
rubble of the reactor building About the removal of the debris from the 
submerged steel  | 
|   12th December 2012  |    About leakage occurrence situation in the turbine building of Unit 3 of Fukushima Dai-ichi NPS  | 
|   5th December 2012  |    About the completion of waterproofing construction of Fukushima Daiichi Nuclear Power Station Unit 3 control building  | 
|   November 28, 2012  |    About
 the result of checking the status of the Fukushima Daiichi Nuclear 
Power Station Unit 3 reactor containment vessel (PCV) gas management 
system duct  | 
|   November 27, 2012  |    On the Increase of Water Injection Volume at Fukushima Daiichi Nuclear Power Station Unit 3  | 
|   November 27, 2012  |    Fukushima
 Daiichi Nuclear Power Station Unit 3 Survey results on sputter fuel 
pool salt removal equipment (Mobile RO) stoppage and hydrochloric acid 
leakage  | 
|   November 26, 2012  |    About confirming the status of the PCV gas management system duct Unit 3 of Fukushima Daiichi Nuclear Power Station Unit 3  | 
|   November 14, 2012  |    About
 the contents of "Report on the facility management plan based on the 
concept of" securing medium-term security "for Fukushima Daiichi Nuclear
 Power Plant No. 1 to 4  | 
|   October 24, 2012  |    About
 the leakage of hydrochloric acid from the Fukushima Daiichi Nuclear 
Power Station Unit 3 spent fuel pool salt removal device (mobile RO)  | 
|   15th October 2012  |    About water leakage in turbine building of Unit 3 of Fukushima Dai-ichi NPS  | 
|   15th October 2012  |    Survey
 status by underwater camera in spent fuel pool of Unit 3 of Fukushima 
Daiichi Nuclear Power Station Unit (October 11 and 12)  | 
|   October 3, 2012  |    Report
 on the Nuclear Regulatory Commission to the instruction document on the
 fall of steel scraps in the spent fuel storage pool of Fukushima 
Daiichi Nuclear Power Station Unit 3  | 
|   September 26, 2012  |    Survey status by underwater camera in spent fuel pool of Fukushima Daiichi Nuclear Power Station Unit No. 3 (for September 26)  | 
|   September 25, 2012  |    Survey status by underwater camera in spent fuel pool of Fukushima Dai-ichi NPS 3  | 
|   September 24, 2012  |    Fukushima Daiichi Nuclear Power Station Unit 3 spent fuel pool debris removal work  | 
|   September 13, 2012  |    On
 the internal investigation of the spent fuel pool towards the removal 
of the upper galleki of reactor building No. 3 of Fukushima Daiichi 
Nuclear Power Station Unit 3  | 
|   September 11, 2012  |    On the decrease of the water injection volume of Units 1 to 3 of Fukushima Daiichi Nuclear Power Station (2nd report)  | 
|   September 11, 2012  |    (32) Ultra high pressure switchgear area 3 and 4 (indoor)  | 
|   September 11, 2012  |    (31) Ultra high pressure switchgear area 3 and 4 (outdoor)  | 
|   September 11, 2012  |    (15) Damaged condition in the premises after the explosion of Units 1, 3, 4  | 
|   September 11, 2012  |    (8) Exterior of Unit 3 after Explosion and Appearance of Unit 4 before Explosion as seen from Unit 3  | 
|   September 10, 2012  |    Present status of Fukushima Daiichi Nuclear Power Station shown in the photograph  | 
|   September 5, 2012  |    About the decrease event of the water injection flow rate of Fukushima Daiichi Nuclear Power Station No. 1 to 3  | 
|   July 13, 2012  |    Fukushima
 Daiichi Nuclear Power Station Unit 3 Expansion Waste Regarding the 
accumulated water confirmed in the underground storage building  | 
|   July 13, 2012  |    【Motion picture】 Survey result of surrounding situation around Fukushima Dai-ichi NPS 3 Unit Reactor Building Operating Floor  | 
|   July 12, 2012  |    On
 the results of the Torus Indoor Survey on the Basement Fukushima 
Daiichi Nuclear Power Station Unit 3 Reactor Building Underground Floor  | 
|   July 11, 2012  |    Survey
 results on surrounding conditions around the Fukushima Daiichi Nuclear 
Power Station Unit 3 Reactor Building Operator Floor  | 
|   July 5, 2012  |    "Development of Remote Decontamination Technique in Building" On the Results of Robot Survey of Unit 2 and 3 Reactor Buildings  | 
|   June 26, 2012  |    Present status of Fukushima Daiichi Nuclear Power Station shown in the photograph  | 
|   25th June 2012  |    About
 construction of water stop part water stop to underground storage 
building of Fukushima Daiichi Nuclear Power Station Unit 3 Unit 3  | 
|   19th June 2012  |    Duct damage of Fukushima Daiichi Nuclear Power Station Unit 3 reactor containment gas gas management system  | 
|   7th June 2012  |    Water level measurement result of Fukushima Daiichi Nuclear Power Station 2, 3 Torus Room  | 
|   May 30, 2012  |    On
 Fukushima Daiichi Nuclear Power Station Unit 3 Waste In-situ Survey 
Results of Pumped Water in Underground Storage Building (May 28 - 29)  | 
|   May 24, 2012  |    Fukushima
 Daiichi Nuclear Power Station Unit 3 Reactor Building 1st Floor TIP 
Indoor Environmental Survey Result (conducted May 23, 2012)  | 
|   20th April 2012  |    Nitrogen gas separation device (PSA-3 PSA-4) cause investigation early response policy at failure  | 
|   20th April 2012  |    [Video] About investigation of Unit 3 Fukushima Dai-ichi NPS Nuclear Containment Equipment Hatch  | 
|   April 19, 2012  |    About investigation of Unit 3 reactor containment vessel equipment hatch of Fukushima Dai-ichi NPS  | 
|   April 16, 2012  |    About stop of nitrogen gas separator (PSA)  | 
|   April 16, 2012  |    [Video] Internal survey aimed at removing rubble from spent fuel pool at Fukushima Daiichi Nuclear Power Station Unit 3  | 
|   April 13, 2012  |    On
 the internal investigation towards the removal of the spare fuel pool 
of the Fukushima Daiichi Nuclear Power Station Unit 3 Unit 3  | 
|   March 16, 2012  |    About the preliminary survey of Fukushima Daiichi 2, 3 torus room (2)  | 
|   March 15, 2012  |    Access survey of Fukushima Daiichi Nuclear Power Station Units 2 and 3 Torus Room (Movie)  | 
|   March 14, 2012  |    About the preliminary survey of Fukushima Daiichi Nos. 2 and 3 torus room  | 
|   February 24, 2012  |    TEPCO's
 Fukushima Daiichi Nuclear Power Plant Preparation for Fuel Debris Entry
 Preparation for Decommissioning Measures etc. Technical Catalog Related
 to the Development of Devices, etc. Explanation Materials in Workshop  | 
|   January 29, 2012  |    On the 29th of January on the water leak condition at Fukushima Daiichi Nuclear Power Station  | 
|   January 26, 2012  |    Response training on occurrence of abnormal spent fuel pool based on safety preservation  | 
|   20th January 2012  |    Present status of Fukushima Daiichi Nuclear Power Station shown in the photograph  | 
|   January 16, 2012  |    Lifting landscape Implementation work for removing obstructions of Units 1 to 4 by taking a watercraft  | 
|   December 24, 2011  |    On the swelling of the reactor water injection hose of Unit 3 of Fukushima Dai-ichi NPS  | 
|   December 17, 2011  |    Current status of Fukushima Dai-ichi NPS  | 
|   November 30, 2011  |    About
 establishing a nitrogen inclusion route into the reactor pressure 
vessel (RPV) of Fukushima Daiichi Nuclear Power Station Units 1 to 3  | 
|   November 22, 2011  |    Measurement of ambient dose by reactor nuclear reactor robot Unit 3 of Fukushima Dai-ichi NPS  | 
|   November 16, 2011  |    Fukushima Daiichi Nuclear Power Station Unit 3 Reactor Building Building Investigation · Cleaning  | 
|   November 8, 2011  |    Situation on the south side of Fukushima Daiichi Nuclear Power Station Unit 3 reactor building building opening  | 
|   November 5, 2011  |    Measurement
 of dose after movement of interfering substances on the passage and 
movement of interfering substances by robot at Unit 3 Reactor Building 
1st Floor  | 
|   October 22, 2011  |    Fukushima Daiichi Nuclear Power Station Unit 3 Reactor Building Equipment Hatch opening  | 
|   15th October 2011  |    Fukushima Daiichi Nuclear Power Station Temperature measurement result directly above the nuclear reactor by infrared camera  | 
|   October 8, 2011  |    Status of Fukushima Daiichi Nuclear Power Station No. 3 Reactor Building Top  | 
|   October 8, 2011  |    Present status of Fukushima Daiichi Nuclear Power Station shown in the photograph  | 
|   October 1, 2011  |    About the outline of the dust collector system  | 
|   October 1, 2011  |    Present status of Fukushima Daiichi Nuclear Power Station shown in the photograph  | 
|   September 28, 2011  |    Fukushima
 Daiichi Nuclear Power Station Unit 2 JAEA-3 entrance scenery inside 
reactor building Landscape in Unit 3 Reactor Building  | 
|   September 24, 2011  |    Status of Fukushima Daiichi Nuclear Power Station No. 3 Reactor Building Top  | 
|   September 13, 2011  |    Fukushima Daiichi Nuclear Power Station Unit 3 Reactor Building Opening Dust sampling scenery  | 
|   September 10, 2011  |    Fukushima Daiichi Nuclear Power Station No.1, Unit 3 Reactor Building Opening Dust Sampling Equipment  | 
|   September 9, 2011  |    Photo of Fukushima Daiichi Nuclear Power Station  | 
|   August 25, 2011  |    Fukushima Daiichi Nuclear Power Station Unit 3 Reactor Building Opening Dust sampling scenery  | 
|   August 1, 2011  |    Small
 glasses on the west side of Fukushima Daiichi Nuclear Power Station 
Unit 3 reactor building, Gravel near the large-sized entrance of Unit 2 
Reactor Building Building  | 
|   July 28, 2011  |    Video of Quince entry area at Unit 3 Fukushima Daiichi Nuclear Power Plant reactor building  | 
|   July 27, 2011  |    Field survey by Quince of Unit 3 Fukushima Daiichi Nuclear Power Station Unit  | 
|   July 18, 2011  |    Work situation of the Fukushima Daiichi Nuclear Power Station Unit 3 turbine building roof installation work  | 
|   July 17, 2011  |    Unit 3 of Fukushima Daiichi Nuclear Power Station Roofscape with rainwater countermeasure  | 
|   July 4, 2011  |    Status of iron plate laying on the 1st floor of Fukushima Daiichi Nuclear Power Station Unit 3 Reactor Building  | 
|   July 2, 2011  |    Cleaning work by Fukushima Daiichi Nuclear Power Station Unit 3 reactor building robot  | 
|   30th June 2011  |    Cleaning system of Fukushima Daiichi Nuclear Power Station Unit 3, 1st floor  | 
|   15th June 2011  |    Dose Survey Results in Unit 3 Fukushima Daiichi Nuclear Power Station Reactor Building  | 
|   14th June 2011  |    Sampling
 situation of radioactive materials in the air at the Fukushima Daiichi 
Nuclear Power Plant upper part of the reactor building (Unit 3)  | 
|   11th June 2011  |    Fukushima Daiichi Nuclear Power Station Unit 3 Reactor Building  | 
|   5th June 2011  |    High dose of debris on the west side of Fukushima Daiichi Nuclear Power Station Unit 3 reactor building  | 
|   May 27, 2011  |    IAEA visit Fukushima  | 
|   May 21, 2011  |    Status of the Fukushima Daiichi Nuclear Power Station Unit 3 Near the reactor building (rubble)  | 
|   May 17, 2011  |    Recovery situation of Fukushima Daiichi Nuclear Power Station  | 
|   May 11, 2011  |    Status of water stop in the vicinity of Fukushima Daiichi Nuclear Power Station Unit 3 intake port  | 
|   May 11, 2011  |    Inflow situation in the pit near the Fukushima Daiichi Nuclear Power Station Unit 3 intake port  | 
|   May 10, 2011  |    Status of the Spent Fuel Pool at Fukushima Daiichi Nuclear Power Station Unit 3  | 
|   20th April 2011  |    Fukushima Daiichi Nuclear Power Station Photographed image (packed image) by pack bot in reactor building  | 
|   April 19, 2011  |    Photo taken by pack bot in Fukushima Dai-ichi Nuclear Power Station reactor building (photo)  | 
|   April 17, 2011  |    Fukushima Daiichi Nuclear Power Station Unit 3 Pak Bot Work in Nuclear Power Building  | 
|   April 16, 2011  |    Photographed images from T-Hawk (No. 1, No. 3, No. 4)  | 
|   15th April 2011  |    Fukushima Daiichi Nuclear Power Station Unit 3 Spent fuel pool Concrete pump car photographed image  | 
|   12th April 2011  |    Fukushima
 Daiichi Nuclear Power Station discharge port sampling Building fire, 
water intake port pre-installation plate work situation, sampling of 
spent fuel pool water  | 
|   11th April 2011  |    Fukushima Daiichi Nuclear Power Station Aerial shooting and equipment / work  | 
|   March 23rd, 2011  |    Central control office of Fukushima Daiichi Nuclear Power Station  | 
|   March 21, 2011  |    Fukushima Daiichi Nuclear Power Station Unit 3  | 
|   March 17, 2011  |    Fukushima Daiichi Nuclear Power Station Units 3 and 4 (Aerial shooting)  | 
|    | 
 
Good pics. How come there are none from Fukushima Daiini down the road? Natures wrath at the end of the day isnt a planet/humanity killer.
ReplyDeleteits most just D1-R3 although some R4 intermixed. Both similar PMC ya know.
Delete